Container image base change: pre-release and first 30 minutes checklists

A base image update changes libraries or users and the service fails to start.

The pre-release checklist maps each item to a test class from the incident page. The first-30-minutes checklist covers detection, containment, the rollback decision and customer communication.

7 pre-release items · 7 first-30-minutes items · verified 2026-10-22

Pre-release checklist

  • PR-01
  • PR-02
  • PR-03
  • PR-04
  • PR-05
  • PR-06
  • PR-07

First 30 minutes

  • FM-01
  • FM-02
  • FM-03
  • FM-04
  • FM-05
  • FM-06
  • FM-07

Download the checklist

Only in this checklist

Every test class in this checklist also appears in at least one sibling checklist in the group; the item texts differ: Start each rebuilt CI image on the same hosted runner infrastructure that customer jobs use and confirm a job inside it builds an image.

Questions

What should be checked before a release to prevent Container image base change?

7 pre-release items, PR-01 to PR-07. PR-01: Start each rebuilt CI image on the same hosted runner infrastructure that customer jobs use and confirm a job inside it builds an image.

Is there a rollback plan for Container image base change?

The first-30-minutes checklist has 7 items. FM-01: Group failing jobs by image tag and digest to confirm the failures follow one image version.

What should a team do in the first 30 minutes after Container image base change is detected?

The first-30-minutes checklist has 7 items. FM-01: Group failing jobs by image tag and digest to confirm the failures follow one image version.

Which configuration checks apply to Container image base change?

PR-03: Run a command inside each rebuilt image that prints the expected user account's id and fail the build when the account is missing. PR-04: Fail the image build when a generated build file meant for a single-stage image contains more than one FROM statement. PR-05: Record the base image's distribution release and packet filter backend on every build and fail when either differs from the previous build without an approved change.

Is a Container image base change checklist still needed if deployment is automated?

Yes. Automation runs the steps; the checklist names what the tests must cover: integration tests, configuration and environment tests and canary and progressive delivery checks.

Which pipeline stages does the Container image base change checklist cover?

The pre-release items map to the pre-deploy and post-deploy stages.